Building and Estate Fibre Infrastructure

Let us bring fibre to your building or estate

Building and Estate Fibre Infrastructure

Free infrastructure installation for building managements: common areas, fire stairs and flat entries included.

Infrastructure free (with subscription commitment)

If you live in an apartment block or estate without fibre, the management board can make a group application and have the infrastructure installed for free. The service is offered subject to a minimum number of subscription commitments.

Process

  1. Building fibre request: the manager fills in the form; the number of flats and existing wiring are recorded.
  2. Survey and design: our team inspects shafts, risers and common areas.
  3. Owners' approval: the approval required by regulation is obtained.
  4. Installation: fibre is pulled from the building entry to the flats in one to three days.

Benefits

  • FTTH speed options for all flats
  • A service fee or dues discount for the building management
  • In-building smart solutions such as cameras, door bells and common-area Wi-Fi

For large estates a dedicated line and business connection for the management office can also be set up.

Scope of service

  • Free infrastructure installation
  • FTTH for every flat
  • Dues support for management
  • One to three days

Building and Estate Fibre Infrastructure — get a quote

Fill in the form and we will get back to you as soon as possible.

Frequently asked questions

What is the difference between fibre and ADSL/VDSL?
Fibre uses light signals for much higher speeds (up to 1 Gbps), low latency and near-symmetric upload. ADSL/VDSL runs over copper telephone lines; speed falls with distance from the exchange and rarely exceeds 100 Mbps.
How do I find out whether fibre is available at my address?
Enter your postal code in the coverage check to see service type, top speed and rollout status. If your code is not listed, fill in the pre-registration form and we will call you when it joins the rollout plan.
How many days does installation take?
After application the installation crew arrives on average within three working days. In buildings needing new infrastructure it can take one to three weeks. Installation is scheduled in two-hour windows.
Are the tariffs genuinely unlimited?
Yes. No residential tariff has a data cap or post-cap throttling (fair use).
Can I move my commitment to another address?
Yes. If you file the move notice at least seven days ahead, your commitment moves to the new address free of charge. If the new address has no infrastructure the contract ends without an early-termination fee.
WhatsApp +90 312 555 29 00 info@kentagfiber.com.tr